OPERATOR PORTFOLIO / 2026RETURNING TO BERKSHIRE, UK

Matthew
Cassell.

Excavator Operator
GPS, Final Trim, Civil Engineering & Major Infrastructure

Precision on the levers.
Experience across the whole site.

12+ YEARS / UNITED KINGDOM & AUSTRALIA

I've worked across major UK and Australian infrastructure, specialising in precision excavation, GPS machine control, drainage and final trim.

UK CPCS
  • Tracked excavator - above and below 10 tonnes
  • Wheeled excavator - above and below 10 tonnes
  • Lifting operations

MACHINE CONTROLCat Grade · Trimble · Topcon

ORIGINAL GROUND LEVELOGL REF ±0.000 m
01 / CORE SKILLS

Core skills.

Accurate bucket work, safe excavation and confidence with drawings, levels and machine control.

Final trim & formation

Accurate formation, grading and bucket work to drawings and levels.

Excavation & services

Deep excavation, trenching, benching, shoring, drainage and underground utility installations.

Machine control

Cat Grade, Trimble and Topcon. Working to design surfaces for earthworks and final trim.

Digital confidence

Strong computer skills and practical problem solving.

02 / PROJECT EXPERIENCE
AU

AUSTRALIA 2025–2026 / WATER · TUNNEL · AIRPORT

2025–2026CAIRNS, QUEENSLAND

Cairns Water Security Stage 1

EXPLORE PROJECT → — Cairns Water Security

Treatment plant & reservoir connection

2026

GNM · Contracting to John Holland

I carry out excavation, pipeline and civil works on the treatment plant and Draper Hill reservoir connection.

Distribution pipelines & final trim

2025–2026

Koppens Construction · Final Trim Operator

I carried out precision trench excavation, pipeline formation, final trim and reinstatement.

2025SYDNEY, NSW / AU

TUNNELLING-RELATED CIVILS / AIRPORT INFRASTRUCTURE

Western Harbour Tunnel
& Western Sydney Airport

RM Civil · Subcontracting to ACCIONA

I carried out drainage, trenching and underground utility installations across tunnel-related and airport civil works.

EXPLORE PROJECT → — Western Harbour Tunnel
UK

UNITED KINGDOM RAIL · HIGHWAYS · UTILITIES · FOUNDATIONS

VARIOUS PROJECT PHASESUNITED KINGDOM

CONTINUING RAIL EXPERIENCE

HS2 / Multiple contractors

Various civil contractors, including J Ffrench

I worked across HS2 civil packages, including Trimble GPS-guided bulk excavation and railway cutting formation.

EXPLORE PROJECT → — HS2
DEC 2021BERKSHIRE / UK

HIGHWAYS INFRASTRUCTURE

M4 Smart Motorway

Balfour Beatty

I carried out civil construction on the M4 Smart Motorway works in Berkshire.

OCT – DEC 2020AMERSHAM, BUCKS / UK

MAJOR RAIL INFRASTRUCTURE

HS2 / J Ffrench

J Ffrench

I carried out ground preparation, excavation and formation works associated with the Amersham ventilation shaft.

EXPLORE PROJECT → — HS2 Amersham
JUN – SEP 2020READING, BERKSHIRE / UK

WATER INFRASTRUCTURE

Thames Water

Clancy Docwra

I carried out civil engineering work on Thames Water infrastructure in Reading.

JUN 2019 – MAR 2020POOLE, DORSET / UK

RESIDENTIAL INFRASTRUCTURE

Keystone Civil Engineering

Keystone Civil Engineering

I worked on footings, drainage, roads and utility installations on a large residential development.

JAN – JUN 2019DORSET / UK

CIVIL ENGINEERING

Gartell & Son

Gartell & Son

I carried out civil engineering works in Dorset.

03 / QUALIFICATIONS & PLANT

Qualifications
& plant.

UK plant qualifications and site safety training.

01

UK CPCS card

  • Tracked excavator - above and below 10 tonnes
  • Wheeled excavator - above and below 10 tonnes
  • Lifting operations
02

NVQ Level 2

Diploma in Plant Operations

03

SSSTS

Site Supervision Safety Training Scheme.

04

First Aid & CPR

First aid academy and training

05

UK driving licence

Full class C

IN THE CAB

Excavators / Dozers / Skid steers / Moxy (ADT) / Telehandlers / Rollers

04 / CONTACTUNITED KINGDOM

Available for
UK opportunities.

Returning to Berkshire. Available for GPS excavator, final trim and civil infrastructure roles.

portfolio.cassell.earth

Download the professional CV ↓