← RETURN TO EXPERIENCEmatthew@cassell.earth ↗
SYDNEY / AUSTRALIA

Western Harbour Tunnel.

Hard ground. Controlled excavation.

Wider project
6.5 km road connection [2]
Stage 2 delivery
ACCIONA / Transport for NSW [1]
My employer
RM Civil
My plant
Approximately 30-tonne class
PROJECT STUDYMATTHEW CASSELL / EXCAVATOR OPERATOR
Excavators and construction equipment inside the Western Harbour Tunnel workfront
Underground civil workfrontThe scale of the tunnel workfront, with excavators and an active construction corridor.Matthew Cassell · Personal project archive.

The harbour crossing connects Rozelle with the Warringah Freeway at Cammeray. ACCIONA delivers Stage 2, covering the harbour crossing and full tunnel fit-out [1]. The new crossing provides a western bypass of the CBD and relieves pressure on existing harbour crossings [2]. My contribution was to the supporting civil works through RM Civil.

01

Drainage, trenching & services

I operated approximately 30-tonne-class excavators on drainage and utility excavations, trench formation and pipe-laying support. I worked from construction drawings, preparing excavations and maintaining the profiles needed for underground infrastructure.

02

Rock breaking & rock sawing

I used hydraulic rock-breaking and rock-sawing attachments in hard ground. This called for controlled removal, accurate cutting and awareness of the surrounding excavation and service interfaces.

03

Heavy plant, detailed work

I combined heavy excavation with the control needed for pipe preparation and technical civil works. My role was excavator operation; the tunnel-boring programme describes the wider project, rather than my own responsibilities.

Official project references.

  1. ACCIONA — Western Harbour Tunnel Stage 2 ↗
  2. Transport for NSW — tunnel alignment and transport purpose ↗

Project facts checked 4 November 2026. Personal responsibilities are described from my own experience. Illustrations are original explanatory work.